Analysis and control of significant risk source of underground diameter project from Beijing railway station to Beijing railway west station

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 23 -28.

PDF (1024KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 23 -28.

Analysis and control of significant risk source of underground diameter project from Beijing railway station to Beijing railway west station

Author information +
History +
PDF (1024KB)

Abstract

Through the detailed risk evaluation on underground diameter project from Beijing railway station to Beijing railway west station, the conditions of all the risk sources along were analyzed adequately. At last, effective control measures of risk prevention and reduction were proposed based on the evaluations results. The settlement of all the measuring points of metro line 2 was lower than 2 mm. Due to the tunnel excavation the settlement of Tianningsi Bridge was lower than 3 mm. The construction impact on surrounding building was very small.

Keywords

tunnel / risk analysis / risk control

Cite this article

Download citation ▾
null. Analysis and control of significant risk source of underground diameter project from Beijing railway station to Beijing railway west station. Strategic Study of CAE, 2010, 12(12): 23-28 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1024KB)

1021

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/