Saddle pushing analysis in suspension bridge construction
Qi Dongchun,Wang Changjiang,Shen Ruli,Lin Qia
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (7) : 68 -73.
Saddle pushing analysis in suspension bridge construction
Some problems existing in saddle pushing, such as the pre-displacement control principle, the relation of tower top displacement and tower bottom stress, the method of determining saddle pushing stages and pushing values, are discussed. The reasonable model of saddle equilibrium condition and the pre-displacement calculation method are expounded. Combining with saddle pushing analysis of Baling River Bridge, the conclusion that the excess pushing scheme can increase the interval of each pushing and reduce pushing times is obtained. The cases following saddle pushing are the unfavorable conditions for main cables anti-sliding checking.
suspension bridge / saddle pushing / saddle equilibrium condition / tower top displacement / tower bottom stress
/
〈 |
|
〉 |