Research on large slurry shield excavation parameter control under complex conditions

Wang Baiquan,Ren Yong,Jin Zhongxiang,Gu Yanqi

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 65 -69.

PDF (1053KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) :65 -69.
Research on large slurry shield excavation parameter control under complex conditions
Author information +
History +
PDF (1053KB)

Abstract

A detailed test on tunnel machine excavation parameter was given, and then the relationship between cutter head torque and tools wear under different underground conditions was analyzed. Some measures for shield posture control and a brief introduction on synchronized grouting parameters and slurry cycle system were also given. In the end, a conclusion on the importance of excavation parameter and slurry density in machine excavation was made.

Keywords

slurry shield / excavation parameter / synchronized grouting / slurry cycling / shield posture

Cite this article

Download citation ▾
Wang Baiquan,Ren Yong,Jin Zhongxiang,Gu Yanqi. Research on large slurry shield excavation parameter control under complex conditions. Strategic Study of CAE, 2010, 12(12): 65-69 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

PDF (1053KB)

2082

Accesses

0

Citation

Detail

Sections
Recommended

/