Study on ground settlement of large diameter slurry shield construction in water-rich sandy gravel stratum

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 94 -97.

PDF (809KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) :94 -97.
Study on ground settlement of large diameter slurry shield construction in water-rich sandy gravel stratum
Author information +
History +
PDF (809KB)

Abstract

Beijing underground diameter project is located in the water-rich sandy gravel formation, which is through many structures .Through the analysis of actual monitoring results,the law of tunneling parameters to surface subsidence and deformation law of important buildings around were summarized. Deformation control was successful compared with similar projects.

Keywords

water-rich sandy gravel / large diameter / slurry shield / settlement law

Cite this article

Download citation ▾
Zhao Baohua,Hu Xibo,Zhang Bing,Li Wenjun. Study on ground settlement of large diameter slurry shield construction in water-rich sandy gravel stratum. Strategic Study of CAE, 2010, 12(12): 94-97 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

PDF (809KB)

1386

Accesses

0

Citation

Detail

Sections
Recommended

/