The design and construction of cat walk system for Taizhou Bridge

Zhou Chang,Du Hongchi

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (4) : 63 -67.

PDF (907KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (4) : 63 -67.

The design and construction of cat walk system for Taizhou Bridge

Author information +
History +
PDF (907KB)

Abstract

Taizhou Bridge is the first kilometer level three-pylon two-span suspension bridge. The middle tower is manufactured by steel with little practical engineering experience. The design and construction of cat walk system is critical to the installation of the superstructures. The design of cat walk system of Taizhou Bridge chosen the continuous four-span structure without anti-wind cables based on the analysis of critical problems of the three-pylon two-span suspension bridge. This paper describes details and construction sequences of the overall design of the cat walk system and the supporting cables, arm rest cable, anchorage system, surface cover, and cross passages, which can be used as references in the similar engineering projects in the near future.

Keywords

suspension bridge / cat walk system / construction

Cite this article

Download citation ▾
Zhou Chang,Du Hongchi. The design and construction of cat walk system for Taizhou Bridge. Strategic Study of CAE, 2010, 12(4): 63-67 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (907KB)

308

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/