Technology for long cable erection of a thousand-meter scale cable-stayed bridge

Rao Huarong,Deng Huibin

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 71 -74.

PDF (1258KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 71 -74.

Technology for long cable erection of a thousand-meter scale cable-stayed bridge

Author information +
History +
PDF (1258KB)

Abstract

In the background of the construction of Sutong Yangtze River Bridge (short as Sutong Bridge), the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are instroduced, Some key constrction techniques, such as outspreading cable on deck, installing cable at pylon, pulling adn fixing cable at the attachment with decks and cable PE protection, are discussed.

Keywords

stay cables of a thousand-meter scale cable-stayed btedge / construction technique for long cables / long cable construction

Author summay

饶华容(1979-),男,湖北天门市人,特种工武汉二航路桥程有限责任公司工程师,从事大型斜拉桥、悬索桥上部结构安装技术研究

Cite this article

Download citation ▾
Rao Huarong,Deng Huibin. Technology for long cable erection of a thousand-meter scale cable-stayed bridge. Strategic Study of CAE, 2009, 11(3): 71-74 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1258KB)

315

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/