Discussion on construction and type selection of China high dams

Zhou Jianping, Yang Zeyan, Chen Guanfu

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (2) : 35 -40.

PDF
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (2) : 35 -40.

Discussion on construction and type selection of China high dams

Author information +
History +
PDF

Abstract

At the beginning of 21st century, with the rapid and steady development of China economy, a lot of large scale hydropower projects with large dams from 200 m to 300 m high are being or to be built. China dam constructions are reaching the level of 300 m high arch dam, 250 high CFRD (concrete face rockfill dam) and 200 m high RCC (roller compacted concrete) gravity dam. Due to the safety and the economy, the type selection for high dams has become the key issue during the argumentation for the hydropower projects, and further efforts are still needed in this aspect for high dams. After reviewing the high dam constructions in China and abroad, authors proposed some advices for the selection of dam types, and hope that it can provide some helpful information for the researches and the design of high dams.

Keywords

construction of high dams / selection of dam types / project layout

Cite this article

Download citation ▾
Zhou Jianping, Yang Zeyan, Chen Guanfu. Discussion on construction and type selection of China high dams. Strategic Study of CAE, 2009, 11(2): 35-40 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF

258

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/