i
This article has been updated.
A Correction to this article was published on .
i
The Original Article was published on
i
The Original Article was published on
i
This article has been updated
i
This article was retracted on
i
This article has been updated
Abstract
At the beginning of 21st century, with the rapid and steady development of China economy, a lot of large scale hydropower projects with large dams from 200 m to 300 m high are being or to be built. China dam constructions are reaching the level of 300 m high arch dam, 250 high CFRD (concrete face rockfill dam) and 200 m high RCC (roller compacted concrete) gravity dam. Due to the safety and the economy, the type selection for high dams has become the key issue during the argumentation for the hydropower projects, and further efforts are still needed in this aspect for high dams. After reviewing the high dam constructions in China and abroad, authors proposed some advices for the selection of dam types, and hope that it can provide some helpful information for the researches and the design of high dams.
Keywords
construction of high dams
/
selection of dam types
/
project layout
Cite this article
Download citation ▾
Zhou Jianping, Yang Zeyan, Chen Guanfu.
Discussion on construction and type selection of China high dams.
Strategic Study of CAE, 2009, 11 (2) : 35-40 DOI:
CHANGE HISTORY
A Correction to this paper has been published:
https://doi.org
The Retraction Note was updated to reflect reception of statements of disagreement from all authors.
This article has been retracted.Please see the Retraction Notice for more detail:
https://doi.org