Design and construction of Sutong Bridge deep-water mainpylon foundations

Ren Huixing, Ouyang Xiaoyong, He Maosheng, Nie Qinlong, Wang Xiali

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 30 -36.

PDF (1656KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 30 -36.

Design and construction of Sutong Bridge deep-water mainpylon foundations

Author information +
History +
PDF (1656KB)

Abstract

This paper, from three aspects including construction conditions, foundation design and construction, introduces some considerations in the designing of mainpylon foundations and some practical measures to deal with certain unfavorable construction conditions, such as deep water, tidal effect, soft stratum and heavy traffic, during the construction of mainpylon foundations.

Keywords

Sutong Bridge / grouppile foundation / design / construction platform / steel cofferdam / scour protection

Cite this article

Download citation ▾
Ren Huixing, Ouyang Xiaoyong, He Maosheng, Nie Qinlong, Wang Xiali. Design and construction of Sutong Bridge deep-water mainpylon foundations. Strategic Study of CAE, 2009, 11(1): 30-36 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1656KB)

287

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/