Abstract
Sutong Bridge is a cablestayed steel box girder bridge with a main span of 1 088 m. The erection of upper structure adopts geometry control method and requires no change to the unit’s size and the structure’s nonestress geometry. Before main span closure, the cantilever of girder reaches 540.8 m, the structure state is noticeably influenced by external circumstances, the main span closure face great difficulty. By abstracting the advantage of the pullback method abroad and the domestic temperaturecutting method, a new assistant pullback method have put forward and bring into practice actually. In this paper, the analysis key point of practice conditions, key parameter of practice, main measures of the method and the performance is introduced.
Keywords
Sutong Bridge
/
assistant pullback
/
main span closure
/
geometric control methord
/
construction technology
Cite this article
Download citation ▾
null.
Assistant pullback technique for main span closure of Sutong Bridge.
Strategic Study of CAE, 2009, 11(1): 69-75 DOI: