Linear programming method with LR type fuzzy numbersfor network scheduling

Gao Peng,Feng Junwen

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (2) : 70 -74.

PDF (735KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (2) : 70 -74.

Linear programming method with LR type fuzzy numbersfor network scheduling

Author information +
History +
PDF (735KB)

Abstract

Estimation of activity duration is a basic problem for project scheduling. However, the uncertainty of activity duration originates from both probability and fuzziness in the real world. This paper develops a linear programming method with LR type fuzzy numbers, which aims to estimate activity duration and identify critical path, and applies the λ - cut to indicate the degree of optimism of a decision maker. Finally, an example is given to demonstrate the application and validity of the proposed method.

Keywords

network scheduling / fuzzy linear programming / activity

Cite this article

Download citation ▾
Gao Peng,Feng Junwen. Linear programming method with LR type fuzzy numbersfor network scheduling. Strategic Study of CAE, 2009, 11(2): 70-74 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (735KB)

280

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/