Design of unballasted track bridges in Beijing-Tianjin inter-city railway

Sun Shuli,Zhang Wenjian,Wang Zhaohu,Su Wei,Wu Cailan,Bu Qinghao

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 32 -42.

PDF (2694KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 32 -42.

Design of unballasted track bridges in Beijing-Tianjin inter-city railway

Author information +
History +
PDF (2694KB)

Abstract

Beijing-Tianjin inter-city railway is the first built passenger dedicated line with the speed of 350 km/h in our country. During the design, new ideas of bridge construction were carried out in order to ensure the safety, amenity and stability requirements of the train under high-speed condition. At the same time, concepts of environmental adaptability, serving for transportation and comprehensive benefits were followed. In the whole line of the railway, long-bridge scheme was adopted, and the most advanced technology of unballasted track was utilized in bridges which account for 87.7 % of the total line. The success of the design and construction of bridges in Beijing-Tianjin inter-city railway accumulated valuable experiences for large-scale construction of high-speed railway at the future. And roles of demonstration, landmark and prototype are played at the same time.

Keywords

Beijing-Tianjin inter-city railway / unballasted track bridge / design concept

Cite this article

Download citation ▾
Sun Shuli,Zhang Wenjian,Wang Zhaohu,Su Wei,Wu Cailan,Bu Qinghao. Design of unballasted track bridges in Beijing-Tianjin inter-city railway. Strategic Study of CAE, 2009, 11(1): 32-42 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2694KB)

326

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/