Optimization design and corollary equipment of box girder prefabrication field for passenger express line

Wang Zhibin,Wang Qingming

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 67 -74.

PDF (1579KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 67 -74.

Optimization design and corollary equipment of box girder prefabrication field for passenger express line

Author information +
History +
PDF (1579KB)

Abstract

On the basis of the research results of the project, the Research on the Industrialization of Freely Supported Box and Girder for Passenger Express Line, in Ministry of Railways and China Railway Construction Corporation, and the programming and design experience for almost 30 girder prefabrication fields, the three important aspects of girder field construction, i.e. site election, plane layout and corollary equipment, are discussed in depth.

Keywords

passenger express line / girder field / site selection / plane layout / corollary equipment

Cite this article

Download citation ▾
Wang Zhibin,Wang Qingming. Optimization design and corollary equipment of box girder prefabrication field for passenger express line. Strategic Study of CAE, 2009, 11(1): 67-74 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1579KB)

272

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/