Design and construction of Sutong Bridge deep-water main pylon foundations

Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 38 -43.

PDF (2142KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 38 -43.

Design and construction of Sutong Bridge deep-water main pylon foundations

Author information +
History +
PDF (2142KB)

Abstract

This paper, from three aspects including construction conditions, foundation design and construction, introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions, such as deep water, tidal effect, soft stratum and heavy traffic, during the construction of main-pylon foundations.

Keywords

Sutong Bridge / group-pile foundation / steel cofferdam / scour protection

Cite this article

Download citation ▾
Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang. Design and construction of Sutong Bridge deep-water main pylon foundations. Strategic Study of CAE, 2009, 11(3): 38-43 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2142KB)

312

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/