Challenges and Innovations in the Sutong Bridge Foundation Project

You Qingzhong,Dong Xuewu and Wu Shouchang

Strategic Study of CAE ›› 2008, Vol. 10 ›› Issue (1) : 15 -22.

PDF
Strategic Study of CAE ›› 2008, Vol. 10 ›› Issue (1) : 15 -22.

Challenges and Innovations in the Sutong Bridge Foundation Project

Author information +
History +
PDF

Abstract

This article introduces three outstanding innovations, i.e. utilization of the steel casing for the piles to establish a construction platform for Sutong Bridge’s large and deeppile groups; 5000 ton steel cofferdam lowered as a whole and used as a protective structure against impact from ship collision; Permanent scour protection. This article also presents economical and reasonable design method for large bridge foundation and explains the significance of innovation and technical integration to large and complicated project construction based on the above theory.

Keywords

foundation / construction platform / steel cofferdam / ship collision / lowering of steel cofferdam / permanent scour protection

Cite this article

Download citation ▾
You Qingzhong,Dong Xuewu and Wu Shouchang. Challenges and Innovations in the Sutong Bridge Foundation Project. Strategic Study of CAE, 2008, 10(1): 15-22 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF

197

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/