A new method to calculate the productivity index for vertical fractured well of tight gas reservoir
Strategic Study of CAE ›› 2008, Vol. 10 ›› Issue (3) : 93 -96.
A new method to calculate the productivity index for vertical fractured well of tight gas reservoir
tight gas reservoir / stress sensitive / threshold pressure / vertical fracture well / productivity analysis
/
| 〈 |
|
〉 |