Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting Mobile Antiship Missile

Hu Ronglin,Li Xingguo

Strategic Study of CAE ›› 2007, Vol. 9 ›› Issue (6) : 48 -52.

PDF (414KB)
Strategic Study of CAE ›› 2007, Vol. 9 ›› Issue (6) : 48 -52.

Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting Mobile Antiship Missile

Author information +
History +
PDF (414KB)

Abstract

The methodology of visual simulation for tunnel engineering construction schedule is presented in this thesis.  Visualization of founding model,  calculation and result of construction schedule simulation are realized.  The simulate model of tunnel engineering construction schedule is founded.  Risk analysis and decision_making method of tunnel engineering construction schedule based on visual simulation are presented.  The resource optimization is conducted.  On the basis of studying the S curve theory and method of schedule management,  tunnel engineering construction schedule S curve real time management and control method based on visual simulation are presented. Practical engineering analysis is made.

Keywords

visual simulation / tunnel construction / optimization analysis / real time control

Cite this article

Download citation ▾
Hu Ronglin,Li Xingguo. Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting Mobile Antiship Missile. Strategic Study of CAE, 2007, 9(6): 48-52 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (414KB)

296

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/