The Study on Supervision Institution Incentive System Based on Asymmetric Information

Cao Yugui,Yang Zhongzhi

Strategic Study of CAE ›› 2005, Vol. 7 ›› Issue (10) : 69 -72.

PDF (2315KB)
Strategic Study of CAE ›› 2005, Vol. 7 ›› Issue (10) : 69 -72.
Research Report

The Study on Supervision Institution Incentive System Based on Asymmetric Information

Author information +
History +
PDF (2315KB)

Abstract

The principal-agent model between employers and engineering supervisors is established, considering such factors as the scale of employers’ investment, special character of engineering supervision and exogenous random variable and its influence. And the influence of these factors on the sensitiveness of compensation performance under asymmetric information is analyzed. Based on the result, factors to be considered while establishing the incentive system of engineering supervision are put forward.

Keywords

employer / engineering supervision / principal-agent / incentive system

Cite this article

Download citation ▾
Cao Yugui,Yang Zhongzhi. The Study on Supervision Institution Incentive System Based on Asymmetric Information. Strategic Study of CAE, 2005, 7(10): 69-72 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2315KB)

224

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/