GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application

Li Jingru,Zhong Denghua

Strategic Study of CAE ›› 2005, Vol. 7 ›› Issue (8) : 70 -74.

PDF (2925KB)
Strategic Study of CAE ›› 2005, Vol. 7 ›› Issue (8) : 70 -74.
Research Report

GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application

Author information +
History +
PDF (2925KB)

Abstract

This paper presents a GIS-based visual simulation methodology for concrete dam construction process, in which system simulation techniques are integrated with visualization techniques. GIS-based visual simulation system (GVSS) was developed by the authors. GVSS is a powerful schedule planning tool offering visualizing and querying capabilities simultaneously. GVSS has been applied to a real concrete dam construction project, which verified the feasibility of the methodology and GVSS.

Keywords

visual simulation / GIS / concrete dam construction / schedule / optimization

Cite this article

Download citation ▾
Li Jingru,Zhong Denghua. GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application. Strategic Study of CAE, 2005, 7(8): 70-74 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2925KB)

235

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/