Dam Concrete Placement by Towerbelt

Peng Gang

Strategic Study of CAE ›› 2004, Vol. 6 ›› Issue (9) : 77 -80.

PDF (2730KB)
Strategic Study of CAE ›› 2004, Vol. 6 ›› Issue (9) : 77 -80.
Modern Management

Dam Concrete Placement by Towerbelt

Author information +
History +
PDF (2730KB)

Abstract

The outstanding properties of concrete placement by towerbelt are the interrupted feeding, high intensity and the capability of direct pouring on the block. However, there would be some problems of back rise of temperature of the pre-cooled concrete during transportation, which is prone to segregation of concrete aggregate if not suitably controlled. Therefore, how to guarantee the concrete placement by towerbelt both at high speed and of good quality is the key issue to be solved during the construction. Some key issues are discussed in the paper at combination with the phase Ⅱ concrete construction of the TGP powerhouse and dam in terms of quality control of raw materials of concrete, counterpart equipment and construction technologies on the pouring block, designs matching and equipment management during the dam concrete placement by towerbelts.

Keywords

TGP / towerbelfs / pouring concrete

Cite this article

Download citation ▾
Peng Gang. Dam Concrete Placement by Towerbelt. Strategic Study of CAE, 2004, 6(9): 77-80 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2730KB)

288

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/