Technical Breakthroughs in the Construction of TGP

Zhang Chaoran,Dai Huichao

Strategic Study of CAE ›› 2003, Vol. 5 ›› Issue (2) : 20 -25.

PDF (4796KB)
Strategic Study of CAE ›› 2003, Vol. 5 ›› Issue (2) : 20 -25.
Thematic Report

Technical Breakthroughs in the Construction of TGP

Author information +
History +
PDF (4796KB)

Abstract

The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made on the issues such as river closure of the Grand Channel and concrete construction of the cutoff wall, prompt concrete construction of dam, high slope construction of permanent shiplock, large-scale steel-lined reinforced concrete penstocks of power station and temperature and pressure maintaining of the spiral case, asphalt concrete core wall, metal works of the shiplock, turbine generating units, and so on.

Keywords

Three Gorges Project / key technique / breakthroughs

Cite this article

Download citation ▾
Zhang Chaoran,Dai Huichao. Technical Breakthroughs in the Construction of TGP. Strategic Study of CAE, 2003, 5(2): 20-25 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (4796KB)

415

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/