Working Procedure of Developing a New Deep Hard-rock Burst-prone Deposit

Guo Ran,Yu Runcang

Strategic Study of CAE ›› 2002, Vol. 4 ›› Issue (7) : 51 -55.

PDF (3257KB)
Strategic Study of CAE ›› 2002, Vol. 4 ›› Issue (7) : 51 -55.
Research Report

Working Procedure of Developing a New Deep Hard-rock Burst-prone Deposit

Author information +
History +
PDF (3257KB)

Abstract

Most of the research work on rockburst in the world is now concentrated on the prediction,control and prevention of rockburst. Few work has been done on how to proceed the rockburst research in developing a new mine with rockburst tendency. In this paper, the authors create a general working procedure to develop a new hard-rock burst-prone mine. The general procedure is divided into 6 steps: initial determination of burst tendency; study of the proneness to rockburst of typical rock samples ;in-situ rock stress measurement; possibility of strain burst in the mine; principles in the selection of mining techniques; setting up seismic monitoring system. The above study results lays a theoretical foundation for applied research of deep hard-rock burst-prone mining.

Keywords

rockburst / mining technique / working procedure

Cite this article

Download citation ▾
Guo Ran,Yu Runcang. Working Procedure of Developing a New Deep Hard-rock Burst-prone Deposit. Strategic Study of CAE, 2002, 4(7): 51-55 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (3257KB)

241

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/