Monitoring Technology to Stability of Layered Rocky High Side Slope

Chen Zhijian

Strategic Study of CAE ›› 2001, Vol. 3 ›› Issue (5) : 86 -91.

PDF (3790KB)
Strategic Study of CAE ›› 2001, Vol. 3 ›› Issue (5) : 86 -91.
Research Report

Monitoring Technology to Stability of Layered Rocky High Side Slope

Author information +
History +
PDF (3790KB)

Abstract

Based on the example of monitoring to the stability of the layered rocky high slope, base and foundation of the south tower of Jiangyin Bridge, the discipline of monitoring mesh design to its stability, the rational arrangement of monitoring spots, the embedding technology of hole with clinometer in fragmentary rock mass in high slope and the establishment of the monitoring and predictive model to the stability of high slope are elucidated. The discriminating discipline for the high slope stability based on the monitoring deformation result, and the quantitative evaluation method based on shear-slip, axial force and horizontal pushing force for the stability of high slope are suggested in the article.

Keywords

Jiangyin Bridge / tower / side slope stability / monitoring / hole with clinometer / monitoring and predictive model

Cite this article

Download citation ▾
Chen Zhijian. Monitoring Technology to Stability of Layered Rocky High Side Slope. Strategic Study of CAE, 2001, 3(5): 86-91 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (3790KB)

285

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/