Successful Practice in Management Reform——An Analysis of Experiences with Guangzhou Pumped Storage Power Station

Luo Shaoji

Strategic Study of CAE ›› 2000, Vol. 2 ›› Issue (11) : 52 -59.

PDF (6422KB)
Strategic Study of CAE ›› 2000, Vol. 2 ›› Issue (11) : 52 -59.
Academician Forum

Successful Practice in Management Reform——An Analysis of Experiences with Guangzhou Pumped Storage Power Station

Author information +
History +
PDF (6422KB)

Abstract

The 2 400 MW Guangzhou pumped storage project became fully operational in March 2000, thus establishing itself as the biggest of its kind in the world.

Based upon successful experiences with the project, the author spotlights the management practices in the four parts: that is project management improvements, reforms on construction management, reforms on plant operation management and reforms on business strategy. Thanks to the above-said reform efforts, the project turns out to be quite a success in terms of cost saving, fast progress, good engineering quality, rich returns plus a friendly environment.

Keywords

Pumped storage / power station / management / reform

Cite this article

Download citation ▾
Luo Shaoji. Successful Practice in Management Reform——An Analysis of Experiences with Guangzhou Pumped Storage Power Station. Strategic Study of CAE, 2000, 2(11): 52-59 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (6422KB)

293

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/