资源类型

期刊论文 4

年份

2019 1

2017 2

2016 1

关键词

冲突预测 1

列车运行图 1

模糊时间函数 1

高速铁路 1

检索范围:

排序: 展示方式:

Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal

null

《工程(英文)》 2017年 第3卷 第1期   页码 150-150 doi: 10.1016/J.ENG.2017.01.002

基于模糊时间知识推理的高速铁路列车运行图冲突预测

庄河, 冯丽萍, 文超, 彭其渊, 汤奇志

《工程(英文)》 2016年 第2卷 第3期   页码 366-373 doi: 10.1016/J.ENG.2016.03.019

摘要: http://engineering.org.cn/EN/10.1016/J.ENG.2017.01.002">Corrigendum to “High-Speed Railway Train Timetable

关键词: 高速铁路     列车运行图     模糊时间函数     冲突预测    

Energy-saving operation approaches for urban rail transit systems

Ziyou GAO, Lixing YANG

《工程管理前沿(英文)》 2019年 第6卷 第2期   页码 139-151 doi: 10.1007/s42524-019-0030-7

摘要: With the accelerated urbanization in China, passenger demand has dramatically increased in large cities, and traffic congestion has become serious in recent years. Developing public urban rail transit systems is an indispensable approach to overcome these problems. However, the high energy consumption of daily operations is an emerging issue due to increased rail transit networks and passenger demands. Thus, reducing the energy consumption and operational cost by using advanced optimization methodologies is an urgent task for operation managers. This work systematically introduces energy-saving approaches for urban rail transit systems in three aspects, namely, train speed profile optimization, utilization of regenerative energy, and integrated optimization of train timetable and speed profile. Future research directions in this field are also proposed to meet increasing passenger demands and network-based urban rail transit systems.

关键词: urban rail transit     energy saving     speed profile optimization     regenerative energy     train timetable    

Metro train rescheduling by adding backup trains under disrupted scenarios

Jiateng YIN, Yihui WANG, Tao TANG, Jing XUN, Shuai SU

《工程管理前沿(英文)》 2017年 第4卷 第4期   页码 418-427 doi: 10.15302/J-FEM-2017044

摘要: In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup trains in storage tracks to alleviate waiting passengers from crowding the platforms and recover from such disruptions. In this study, we first develop a mixed integer programming model to determine the optimal train rescheduling plan with considerations of in-service and backup trains. The aim of train rescheduling is to frequently dispatch trains to evacuate delayed passengers after the disruption. Given the nonlinearity of the model, several linearization techniques are adapted to reformulate the model into an equivalent linear model that can be easily handled by the optimization software. Numerical experiments are implemented to verify the effectiveness of the proposed train rescheduling approach.

关键词: train rescheduling     backup train     metro line     disruption     timetable    

标题 作者 时间 类型 操作

Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal

null

期刊论文

基于模糊时间知识推理的高速铁路列车运行图冲突预测

庄河, 冯丽萍, 文超, 彭其渊, 汤奇志

期刊论文

Energy-saving operation approaches for urban rail transit systems

Ziyou GAO, Lixing YANG

期刊论文

Metro train rescheduling by adding backup trains under disrupted scenarios

Jiateng YIN, Yihui WANG, Tao TANG, Jing XUN, Shuai SU

期刊论文