Risk Management and Controlling Measures Utilized During Implementation of China Railway’s “Go Global” Strategy

Chunyang Chen, Deming Yu

Strategic Study of CAE ›› 2017, Vol. 19 ›› Issue (5) : 62-67.

PDF(290 KB)
PDF(290 KB)
Strategic Study of CAE ›› 2017, Vol. 19 ›› Issue (5) : 62-67. DOI: 10.15302/J-SSCAE-2017.05.011
Study on Special Subjects

Risk Management and Controlling Measures Utilized During Implementation of China Railway’s “Go Global” Strategy

Author information +
History +

Abstract

Taking China Railway's "Go Global" risks as the research objectives, and adopting a combination of literature research, investigation, and case study methods, this paper establishes China Railway's "Go Global" risk breakdown structure. Utilizing the front-end stage of overseas build-operate-transfer (BOT) project as an example, this paper identifies the specific critical risks of China Railway's "Go Global" strategy, and analyses its preventive measures, as well as other common risk management and controlling measures. It is expected that the research results will provide reference for China Railway's "Go Global" risk management and controlling.

Keywords

China Railway’s “Go Global” strategy risk / risk breakdown structure / front-end stage of overseas BOT project / risk management and controlling measures

Cite this article

Download citation ▾
Chunyang Chen, Deming Yu. Risk Management and Controlling Measures Utilized During Implementation of China Railway’s “Go Global” Strategy. Strategic Study of CAE, 2017, 19(5): 62‒67 https://doi.org/10.15302/J-SSCAE-2017.05.011

References

[1]
Zhao X B, Hwang B G, Yu G S Y. Identifying the critical risks in underground rail international construction joint ventures: Case study of Singapore [J]. International Journal of Project Manage-ment, 2013, 31(4): 554–566.
[2]
谢海燕. “一带一路”战略下中国高铁走出去的现状、风险及对策 [J]. 全国商情, 2015, 16(20): 35–38.
[3]
Fang C, Marle F, Zio E, et al. Network theory-based analysis of risk interactions in large engineering projects [J]. Reliability Engi-neering and System Safety, 2012, 106(2): 1–10.
[4]
Bu-Qammaz A S, Dikmen I, Birgonu M T. Risk assessment of international construction projects using the analytic network process [J]. Canadian Journal of Civil Engineering, 2009, 36(7): 1170–1181.
[5]
Tserng H P, Yin S Y L, Dzeng R J, et al. A study of ontology-based risk management framework of construction projects through project life cycle [J]. Automation in Construction, 2009, 18(7): 994–1008.
[6]
刘俊颖, 李志永. 国际工程风险管理 [M]. 北京: 中国建筑工业出版社, 2013.
[7]
陈春阳, 宇德明. 中国铁路“走出去”风险管理研究 [R]. 长沙: 中南大学, 2017.
[8]
中华人民共和国商务部对外投资和经济合作司, 商务部国际贸易经济合作研究院. “走出去”典型案例(经验摘编) [Z]. 中华人民共和国商务部对外投资和经济合作司, 商务部国际贸易经济合作研究院, 2014.
AI Summary AI Mindmap
PDF(290 KB)

Accesses

Citations

Detail

Sections
Recommended

/