Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel

Qu Shouxin

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (7) : 24 -29.

PDF (2344KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (7) : 24 -29.

Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel

Author information +
History +
PDF (2344KB)

Abstract

A comparison of the bridge programs and the tunnel programs for the project of across the sea in Chinese Xiamen Xiang'an was given in this paper. And there is a preliminary and brief conclusion for the construction of the Chinese first subsea tunnel, which contains the characteristics and difficulties and disadvantages of the construction.

Keywords

Xiamen Xiang’an subsea tunnel / construction technology / preliminary conclusions of experience

Cite this article

Download citation ▾
Qu Shouxin. Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel. Strategic Study of CAE, 2009, 11(7): 24-29 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2344KB)

399

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/