Technology for long cable erection of a thousandmeter scale cablestayed bridge

Rao Huarong, Deng Huibin

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 59 -62.

PDF (856KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 59 -62.

Technology for long cable erection of a thousandmeter scale cablestayed bridge

Author information +
History +
PDF (856KB)

Abstract

In the background of the construction of Sutong Yangtze River Bridge (short as Sutong Bridge), the cable construction method and techniques of a thousandmeter scale cablestayed bridge are introduced. Some key construction techniques, such as outspreading cable on deck, installing cable at pylon, pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.

Keywords

a thousandmeter scale cablestayed bridge long cable / outspreading cable / the final scheme of construction technique for long cables / long cable construction

Cite this article

Download citation ▾
Rao Huarong, Deng Huibin. Technology for long cable erection of a thousandmeter scale cablestayed bridge. Strategic Study of CAE, 2009, 11(1): 59-62 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (856KB)

291

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/