Study on Project Progress Curve Model

Ding Shibao

Strategic Study of CAE ›› 2008, Vol. 10 ›› Issue (1) : 74 -78.

PDF (100KB)
Strategic Study of CAE ›› 2008, Vol. 10 ›› Issue (1) : 74 -78.

Study on Project Progress Curve Model

Author information +
History +
PDF (100KB)

Abstract

Because of the discrepancy of project types, the project progress curves present different characteristics. Studying project progress curves can reduce management risk of project and overall grasp the enforcement condition of the project. Combining project characteristic, this paper reaches 4 kinds of project progress curve patterns. If the front of the progress curve is concave, and its rear is protruding in the break point, it is named as S model. If its front is protruding and its rear is concave in the break point, it is named as the reverse side of S model. If the front and rear are concave in the break point, it is named as J model, and two half sections are both upward protruding, it is named as the reverse side of J model. Through a case study, it shows that application project progress curve model can better raise project management.

Keywords

progress curve model / reverse side of S model / reverse side of J model

Cite this article

Download citation ▾
Ding Shibao. Study on Project Progress Curve Model. Strategic Study of CAE, 2008, 10(1): 74-78 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (100KB)

218

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/