Technical Methods to Make Safety Monitoring and Forecast Models for the Foundation of Long Suspension Bridges

Chen Zhijian1、 Zhou Shizhong2、 Zhuo Jiashou1

Strategic Study of CAE ›› 2002, Vol. 4 ›› Issue (6) : 20-24.

PDF(3487 KB)
PDF(3487 KB)
Strategic Study of CAE ›› 2002, Vol. 4 ›› Issue (6) : 20-24.
Academic Papers

Technical Methods to Make Safety Monitoring and Forecast Models for the Foundation of Long Suspension Bridges

  • Chen Zhijian1、 Zhou Shizhong2、 Zhuo Jiashou1

Author information +
History +

Abstract

After stating the complexity of stability problem and the importance and technical difficulty to make safety monitoring model for layered rocky slope of foundation of the south tower and resistance body of south anchorage in Jiangyin Yangtze Bridge, this paper introduces the technical methods to wake the model of tower load distribution, the monitoring and alarm model of residual anchorage thrust, j. e. , cause factor of slope stability, the comprehensive fuzzy evaluation model for slope safety based on external deformation observation results and the forecast model for the stability of layered rocky slope based on observed internal shear displacement.

Keywords

layered rock mass / slope / monitoring and forecast model / technical methods

Cite this article

Download citation ▾
Chen Zhijian,Zhou Shizhong ,Zhuo Jiashou. Technical Methods to Make Safety Monitoring and Forecast Models for the Foundation of Long Suspension Bridges. Strategic Study of CAE, 2002, 4(6): 20‒24
AI Summary AI Mindmap
PDF(3487 KB)

Accesses

Citations

Detail

Sections
Recommended

/