Phase Ⅲ RCC Cofferdam Construction of TGP

Zhang Shuguang

Strategic Study of CAE ›› 2003, Vol. 5 ›› Issue (11) : 79-81.

PDF(1778 KB)
PDF(1778 KB)
Strategic Study of CAE ›› 2003, Vol. 5 ›› Issue (11) : 79-81.
Technological Innovation

Phase Ⅲ RCC Cofferdam Construction of TGP

  • Zhang Shuguang

Author information +
History +

Abstract

The phase Ⅲ RCC cofferdam construction belongs to the phase Ⅲ diversion works. It is a key item to ensure achievement of the reservoir impoundment, navigation and power generation in 2003 and the guarantee to the safety construction of the follow-up right-bank intake dam section and the powerhouse. Restrained by navigation while construction, the construction site and duration, both the concreting intensity and the rise height of the phase Ⅲ RCC cofferdam exceed the current construction level. In view of these difficulties, a huge amount of research work has been performed by relevant departments and is described in the paper.

Keywords

TGP / RCC cofferdam / concrete

Cite this article

Download citation ▾
Zhang Shuguang. Phase Ⅲ RCC Cofferdam Construction of TGP. Strategic Study of CAE, 2003, 5(11): 79‒81