Technical Breakthroughs in the Construction of TGP

Zhang Chaoran、 Dai Huichao

Strategic Study of CAE ›› 2003, Vol. 5 ›› Issue (2) : 20-25.

PDF(4796 KB)
PDF(4796 KB)
Strategic Study of CAE ›› 2003, Vol. 5 ›› Issue (2) : 20-25.
Thematic Report

Technical Breakthroughs in the Construction of TGP

  • Zhang Chaoran、 Dai Huichao

Author information +
History +

Abstract

The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made on the issues such as river closure of the Grand Channel and concrete construction of the cutoff wall, prompt concrete construction of dam, high slope construction of permanent shiplock, large-scale steel-lined reinforced concrete penstocks of power station and temperature and pressure maintaining of the spiral case, asphalt concrete core wall, metal works of the shiplock, turbine generating units, and so on.

Keywords

Three Gorges Project / key technique / breakthroughs

Cite this article

Download citation ▾
Zhang Chaoran,Dai Huichao. Technical Breakthroughs in the Construction of TGP. Strategic Study of CAE, 2003, 5(2): 20‒25
AI Summary AI Mindmap
PDF(4796 KB)

Accesses

Citations

Detail

Sections
Recommended

/