Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station

Shen Mingliang1、 Chen Lihua1、 Chen Wei2、 Sheng Lemin2、 Su Jun'an2

Strategic Study of CAE ›› 2004, Vol. 6 ›› Issue (6) : 68-73.

PDF(3481 KB)
PDF(3481 KB)
Strategic Study of CAE ›› 2004, Vol. 6 ›› Issue (6) : 68-73.
Research Report

Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station

  • Shen Mingliang1、 Chen Lihua1、 Chen Wei2、 Sheng Lemin2、 Su Jun'an2

Author information +
History +

Abstract

In view of simulation for concrete dam construction process of the Xiangjiaba Hydro Station, the paper systemically analyses the relation and condition among various main factors during concrete dam construction process. An integration plan, with tower belts and cable cranes as the main equipment and the gantry cranes, belt conveyers as the supplementary equipment, has been adopted for Xiangjiaba construction. By using algorithmic procedure of choosing block from separate bin, simulation result for concrete dam construction is made in the form of three-dimension visual simulation. Furthermore, the authors haveresolved key questions of optimizing execution program of work, matching construction machine and equipment and verification of dam construction schedule.

Keywords

Xiangjiaba Hydro Station / construction simulation / concrete construction / comparison of drafts

Cite this article

Download citation ▾
Shen Mingliang,Chen Lihua,Chen Wei,Sheng Lemin,Su Junan. Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station. Strategic Study of CAE, 2004, 6(6): 68‒73
AI Summary AI Mindmap
PDF(3481 KB)

Accesses

Citations

Detail

Sections
Recommended

/