Determination Model for Replacement of Water Pipeline

Cui Hongsheng1、Zhang Hongwei2、Niu Zhiguang2、Fu Yufen3

Strategic Study of CAE ›› 2007, Vol. 9 ›› Issue (9) : 68-71.

PDF(393 KB)
PDF(393 KB)
Strategic Study of CAE ›› 2007, Vol. 9 ›› Issue (9) : 68-71.

Determination Model for Replacement of Water Pipeline

  • Cui Hongsheng1、Zhang Hongwei2、Niu Zhiguang2、Fu Yufen3

Author information +
History +

Abstract

A fund distribution model for water pipeline replacement at the level of limited fund is established.  By analyzing maintenance fee of pipe network and construction fee,  and decreasing the difference of pipeline maintenance fee before and after replacement at the most,  the pipeline needed to be replaced is determined.  The establishment of model makes construction fund be utilized fully,  and decreases pipeline leakage loss most effcfivedy,  and provides theoretical support and guidance for water supply department to utilize fund reasonably,  control leakage loss and production and marketing difference ratio effectively.

Keywords

water pipeline / maintenance fee / replacement fee / fund distribution

Cite this article

Download citation ▾
Cui Hongsheng,Zhang Hongwei,Niu Zhiguang,Fu Yufen. Determination Model for Replacement of Water Pipeline. Strategic Study of CAE, 2007, 9(9): 68‒71
AI Summary AI Mindmap
PDF(393 KB)

Accesses

Citations

Detail

Sections
Recommended

/