Study on Project Progress Curve Model
Author information
+
Hunan University of Science & Technology , Xiangtan, Hunan 411201, China
Show less
History
+
Abstract
Because of the discrepancy of project types, the project progress curves present different characteristics. Studying project progress curves can reduce management risk of project and overall grasp the enforcement condition of the project. Combining project characteristic, this paper reaches 4 kinds of project progress curve patterns. If the front of the progress curve is concave, and its rear is protruding in the break point, it is named as S model. If its front is protruding and its rear is concave in the break point, it is named as the reverse side of S model. If the front and rear are concave in the break point, it is named as J model, and two half sections are both upward protruding, it is named as the reverse side of J model. Through a case study, it shows that application project progress curve model can better raise project management.
Keywords
progress curve model /
reverse side of S model /
reverse side of J model
Cite this article
Download citation ▾
Ding Shibao.
Study on Project Progress Curve Model. Strategic Study of CAE, 2008, 10(1): 74‒78
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
This is a preview of subscription content, contact
us for subscripton.