Quick safety construction technology on electric railway multiple line’s tunnel blast boring

Wang Faming

Strategic Study of CAE ›› 2008, Vol. 10 ›› Issue (5) : 58-62.

PDF(825 KB)
PDF(825 KB)
Strategic Study of CAE ›› 2008, Vol. 10 ›› Issue (5) : 58-62.

Quick safety construction technology on electric railway multiple line’s tunnel blast boring

  • Wang Faming

Author information +
History +

Abstract

How to ensure the existing tunnel's safety and the train normal running while the electric railway multiple line tunnel was blast boring? By study and practice,the paper gives an answer through stepped digging method, underholing style, holes scatter and the structure of the hole and detonation technology. It receives good technological achievement and remarkable social and economic benefits in practical application. It provides successful experience for the similar engineering in the future too.

Keywords

electric railway / the existing tunnel / multiple line tunnel / stepped digging / underholing style

Cite this article

Download citation ▾
Wang Faming. Quick safety construction technology on electric railway multiple line’s tunnel blast boring. Strategic Study of CAE, 2008, 10(5): 58‒62
AI Summary AI Mindmap
PDF(825 KB)

Accesses

Citations

Detail

Sections
Recommended

/