The 32 m span box girder prestressing effect monitoring and creep camber control for Wuhan-Guangzhou passenger express line

Song Jinxi

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 60-66.

PDF(1417 KB)
PDF(1417 KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 60-66.

The 32 m span box girder prestressing effect monitoring and creep camber control for Wuhan-Guangzhou passenger express line

  • Song Jinxi

Author information +
History +

Abstract

As a case for study, the online montoring and numerical analysis for 32 m concrete prestressed box girder prestressing and elastic camber effect in Wuhan-Guangzhou passenger express line was performed in the paper. The effect of monitoring and analysis, based on the engineering practice, the control measures of the box girder creep camber were put forward, which can be taken as a reference and experience guidance for the similar projects.

Keywords

Wuhan-Guangzhou passenger express line / 32 m box girder / prestressing effect monitoring / creep camber control

Cite this article

Download citation ▾
Song Jinxi. The 32 m span box girder prestressing effect monitoring and creep camber control for Wuhan-Guangzhou passenger express line. Strategic Study of CAE, 2009, 11(1): 60‒66
AI Summary AI Mindmap
PDF(1417 KB)

Accesses

Citations

Detail

Sections
Recommended

/