Optimization design and corollary equipment of box girder prefabrication field for passenger express line

Wang Zhibin1、Wang Qingming2

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 67-74.

PDF(1579 KB)
PDF(1579 KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (1) : 67-74.

Optimization design and corollary equipment of box girder prefabrication field for passenger express line

  • Wang Zhibin1、Wang Qingming2

Author information +
History +

Abstract

On the basis of the research results of the project, the Research on the Industrialization of Freely Supported Box and Girder for Passenger Express Line, in Ministry of Railways and China Railway Construction Corporation, and the programming and design experience for almost 30 girder prefabrication fields, the three important aspects of girder field construction, i.e. site election, plane layout and corollary equipment, are discussed in depth.

Keywords

passenger express line / girder field / site selection / plane layout / corollary equipment

Cite this article

Download citation ▾
Wang Zhibin,Wang Qingming. Optimization design and corollary equipment of box girder prefabrication field for passenger express line. Strategic Study of CAE, 2009, 11(1): 67‒74
AI Summary AI Mindmap
PDF(1579 KB)

Accesses

Citations

Detail

Sections
Recommended

/