
Sutong Bridge—a cable-stayed bridge with main span of 1 088 meters
You Qingzhong1、He Ping1、Dong Xuewu1、Zhang Xigang2、Wu Shouchang1
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 14-19.
Sutong Bridge—a cable-stayed bridge with main span of 1 088 meters
You Qingzhong1、He Ping1、Dong Xuewu1、Zhang Xigang2、Wu Shouchang1
In this paper, design and construction concepts are briefly presented. Furthermore, key technologies and innovative achievements are summarized mainly on piled foundation bearing capacity analysis, river bed scour protection and monitoring, superstructure wind-resistance study, mid-span closure method as well as long cantilever structure construction control.
Sutong cable-stayed bridge / foundation / pylon / steel box girder / cable stay / construction control
/
〈 |
|
〉 |