Design and construction of Sutong Bridge deep-water main pylon foundations

Ren Huixing、Ouyang Xiaoyong、He Maosheng、Yang Hong、Sun Keqiang

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 38-43.

PDF(2142 KB)
PDF(2142 KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 38-43.

Design and construction of Sutong Bridge deep-water main pylon foundations

  • Ren Huixing、Ouyang Xiaoyong、He Maosheng、Yang Hong、Sun Keqiang

Author information +
History +

Abstract

This paper, from three aspects including construction conditions, foundation design and construction, introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions, such as deep water, tidal effect, soft stratum and heavy traffic, during the construction of main-pylon foundations.

Keywords

Sutong Bridge / group-pile foundation / steel cofferdam / scour protection

Cite this article

Download citation ▾
Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang. Design and construction of Sutong Bridge deep-water main pylon foundations. Strategic Study of CAE, 2009, 11(3): 38‒43
AI Summary AI Mindmap
PDF(2142 KB)

Accesses

Citations

Detail

Sections
Recommended

/