Technology for long cable erection of a thousand-meter scale cable-stayed bridge

Rao Huarong、Deng Huibin

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 71-74.

PDF(1258 KB)
PDF(1258 KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 71-74.

Technology for long cable erection of a thousand-meter scale cable-stayed bridge

  • Rao Huarong、Deng Huibin

Author information +
History +

Abstract

In the background of the construction of Sutong Yangtze River Bridge (short as Sutong Bridge), the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are instroduced, Some key constrction techniques, such as outspreading cable on deck, installing cable at pylon, pulling adn fixing cable at the attachment with decks and cable PE protection, are discussed.

Keywords

stay cables of a thousand-meter scale cable-stayed btedge / construction technique for long cables / long cable construction

Cite this article

Download citation ▾
Rao Huarong,Deng Huibin. Technology for long cable erection of a thousand-meter scale cable-stayed bridge. Strategic Study of CAE, 2009, 11(3): 71‒74
AI Summary AI Mindmap
PDF(1258 KB)

Accesses

Citations

Detail

Sections
Recommended

/