Assistant pullback technology for main span closure of Sutong Bridge

Chen Ming1、Luo Chengbin1、Wu Qihe1,2、Zhang Yongtao1,2、You Xinpeng1,2

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 75-80.

PDF(659 KB)
PDF(659 KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (3) : 75-80.

Assistant pullback technology for main span closure of Sutong Bridge

  • Chen Ming1、Luo Chengbin1、Wu Qihe1,2、Zhang Yongtao1,2、You Xinpeng1,2

Author information +
History +

Abstract

By abstracting the advantage of the pullback method abroad and the deomestric temperature-cutting method, a new assistant pullback method is put forward and brought into practice actually. In this paper, the analysis key point of practice conditions, key parameter of practice, main measures of the method and the performance are introduced.

Keywords

Sutong Bridge / assistant pullback / middle span closure / geometric control method / construction technology

Cite this article

Download citation ▾
Chen Ming,Luo Chengbin,Wu Qihe,Zhang Yongtao,You Xinpeng. Assistant pullback technology for main span closure of Sutong Bridge. Strategic Study of CAE, 2009, 11(3): 75‒80
AI Summary AI Mindmap
PDF(659 KB)

Accesses

Citations

Detail

Sections
Recommended

/