
Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel
Qu Shouxin
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (7) : 24-29.
Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel
Qu Shouxin
A comparison of the bridge programs and the tunnel programs for the project of across the sea in Chinese Xiamen Xiang'an was given in this paper. And there is a preliminary and brief conclusion for the construction of the Chinese first subsea tunnel, which contains the characteristics and difficulties and disadvantages of the construction.
Xiamen Xiang’an subsea tunnel / construction technology / preliminary conclusions of experience
/
〈 |
|
〉 |