Study on construction technique of large section sub-sea tunnel crossing the weak stratum

Huang Mingli、Lu Wei、Xu Hengguo、Tan Zhongsheng

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (7) : 35-38.

PDF(883 KB)
PDF(883 KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (7) : 35-38.

Study on construction technique of large section sub-sea tunnel crossing the weak stratum

  • Huang Mingli、Lu Wei、Xu Hengguo、Tan Zhongsheng

Author information +
History +

Abstract

Xiang'an sub-sea tunnel is the first large section sub-sea tunnel in China, and will cross the weak stratum with abundant water. As the low stabilizing capacity of the surrounding rocks, water inrush is the maximal risk during the sub-sea tunnel construction. In this paper, based on analyzing the excavation method of the tunnel and results of on site monitoring measurement, we studied the excavation method,drainage technique and pre-reinforcement method of the tunnel when crossing the weak stratum with abundant water, and offer technological support for construction.

Keywords

Xiamen Xiang’an sub-sea tunnel / weak stratum / construction technique

Cite this article

Download citation ▾
Huang Mingli,Lu Wei,Xu Hengguo,Tan Zhongsheng. Study on construction technique of large section sub-sea tunnel crossing the weak stratum. Strategic Study of CAE, 2009, 11(7): 35‒38
AI Summary AI Mindmap
PDF(883 KB)

Accesses

Citations

Detail

Sections
Recommended

/