Key technology of design and construction on immersed tube tunnel

Du Chaowei、Wang Xiuying

Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (7) : 76-80.

PDF(657 KB)
PDF(657 KB)
Strategic Study of CAE ›› 2009, Vol. 11 ›› Issue (7) : 76-80.

Key technology of design and construction on immersed tube tunnel

  • Du Chaowei、Wang Xiuying

Author information +
History +

Abstract

Combined with the built immersed tube tunnel, comparison and selection of dry-dock scheme, waterproof design of tube sections and joints are analyzed. The key technologys such as tube prefabrication, tube floating, tube sinking, jointing underwater and foundation treatment method are generalized.

Keywords

immersed tube tunnel / scheme comparison / waterproof design / construction technology

Cite this article

Download citation ▾
Du Chaowei,Wang Xiuying. Key technology of design and construction on immersed tube tunnel. Strategic Study of CAE, 2009, 11(7): 76‒80
AI Summary AI Mindmap
PDF(657 KB)

Accesses

Citations

Detail

Sections
Recommended

/