Abstract

The installation methods used in offshore wind farm around the world were summarized, and the process of split installation, the set necessity and principles of assembly base were analyzed. 8 kinds of typical land-based assembly programs and the assembly technology of main parts were summarized. An installation method was proposed by sitting of the diving boat. The diving installation ship was made by installing a crane, and was located in the seabed during the operation to hoist the turbine components. The installation method is suitable for offshore wind farm construction. The application of the installation method in the test turbine project of Jiangsu Xiangshui offshore wind farm was introduced in the paper finally.

Keywords

offshore wind farm / method of assembled on shore / method of split installation / application

Cite this article

Download citation ▾
Sun Guangxi,Huang Yaxin. The split installation and application of offshore wind turbine generator systems. Strategic Study of CAE, 2010, 12(11): 53‒59
AI Summary AI Mindmap
PDF(1182 KB)

Accesses

Citations

Detail

Sections
Recommended

/