The vertical shaft construction-technology of the cutter transformation of large-diameter shield

Wang Zhenfei、He Feng、He Shanning

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 103-107.

PDF(1221 KB)
PDF(1221 KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 103-107.

The vertical shaft construction-technology of the cutter transformation of large-diameter shield

  • Wang Zhenfei、He Feng、He Shanning

Author information +
History +

Abstract

Taking vertical shaft construction of the cutter transformation of the Beijing underground diameter shield for example, the design and construction of cutter structure transformation under complex boundary conditions for large-diameter shield shaft were discussed. Practice about how to ensure the structural safety of the shaft as well as well-coordinated shield construction was explored, and reliable solutions were provided successfully, which can provide reference for similar projects.

Keywords

large-diameter shield / transformation shaft / complex conditions

Cite this article

Download citation ▾
Wang Zhenfei,He Feng,He Shanning. The vertical shaft construction-technology of the cutter transformation of large-diameter shield. Strategic Study of CAE, 2010, 12(12): 103‒107
AI Summary AI Mindmap
PDF(1221 KB)

Accesses

Citations

Detail

Sections
Recommended

/