System management and typical fault analysis of large diameter slurry shield

Li Xiaogang1、Li Shengli2、Niu Xuechen1

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 51-55.

PDF(1096 KB)
PDF(1096 KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (12) : 51-55.

System management and typical fault analysis of large diameter slurry shield

  • Li Xiaogang1、Li Shengli2、Niu Xuechen1

Author information +
History +

Abstract

Based on the typical fault analysis of large diameter slurry shield of Beijing underground diameter, the corresponding treatment and preventive measures were proposed, these faults including cutter stuck, shield tail leakage, tail brush damage, segment erector failure, etc. Meanwhile, the shield was maintained in advance with predictability through the oil sample analysis, and the intact rate was guaranteed objectively. In the construction process, the "zero inventory"  and a set of scientific equipment management methods like factory management were introduced, making the intact rate of shield machine grow from 60 % to 85 % and even higher, so the normal tunneling progress was ensured.

Keywords

shield / fault / diagnose / management / technology

Cite this article

Download citation ▾
Li Xiaogang,Li Shengli,Niu Xuechen. System management and typical fault analysis of large diameter slurry shield. Strategic Study of CAE, 2010, 12(12): 51‒55
AI Summary AI Mindmap
PDF(1096 KB)

Accesses

Citations

Detail

Sections
Recommended

/