Abstract

A detailed test on tunnel machine excavation parameter was given, and then the relationship between cutter head torque and tools wear under different underground conditions was analyzed. Some measures for shield posture control and a brief introduction on synchronized grouting parameters and slurry cycle system were also given. In the end, a conclusion on the importance of excavation parameter and slurry density in machine excavation was made.

Keywords

slurry shield / excavation parameter / synchronized grouting / slurry cycling / shield posture

Cite this article

Download citation ▾
Wang Baiquan,Ren Yong,Jin Zhongxiang,Gu Yanqi. Research on large slurry shield excavation parameter control under complex conditions. Strategic Study of CAE, 2010, 12(12): 65‒69
AI Summary AI Mindmap
PDF(1053 KB)

Accesses

Citations

Detail

Sections
Recommended

/