Tracking of safety hazards and real-time-prediction model of safety risks on construction sites

Wu Weiwei1、Patrick T. I. LAM2、Li Qiming1、Michael C. H. YAM2、David A. S. CHEW3

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (3) : 68-72.

PDF(808 KB)
PDF(808 KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (3) : 68-72.

Tracking of safety hazards and real-time-prediction model of safety risks on construction sites

  • Wu Weiwei1、Patrick T. I. LAM2、Li Qiming1、Michael C. H. YAM2、David A. S. CHEW3

Author information +
History +

Abstract

This paper aims to explore the tracking approach of safety hazards and real-time-prediction methods of safety risks on construction sites. A literature review of safety issues on construction sites is first conducted. Consequently, a schematic model of tracking safety hazards and real-time prediction of safety risks is formulated and the corresponding methodologies are summarized. This study would provide a possible research approach on method for tracking safety hazards and real-time prediction of safety risks, while serving as a foundation for further study by drawing researchers' attention to the precursor signals of safety hazards on construction sites.

Keywords

construction sites / safety risks / real-time prediction / precursor signals / signal detection theory

Cite this article

Download citation ▾
Wu Weiwei,Patrick T. I. LAM,Li Qiming,Michael C. H. YAM,David A. S. CHEW. Tracking of safety hazards and real-time-prediction model of safety risks on construction sites. Strategic Study of CAE, 2010, 12(3): 68‒72
PDF(808 KB)

Accesses

Citations

Detail

Sections
Recommended

/