Latest research progress of main cable dehumidification system of suspension bridge in China

Chen Ce

Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (4) : 95-99.

PDF(1768 KB)
PDF(1768 KB)
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (4) : 95-99.

Latest research progress of main cable dehumidification system of suspension bridge in China

  • Chen Ce

Author information +
History +

Abstract

This paper describes the latest progress of main cable dehumidification system key technology, including the dry air dehumidification system design parameters research, the main cable over-pressure exhaust system research, dehumidifiers energy-saving research, and S-type wire localization research, etc.

Keywords

dry air dehumidification / design parameters / over-pressure exhaust system / energy-efficient dehumidifier / S-type wire development

Cite this article

Download citation ▾
Chen Ce. Latest research progress of main cable dehumidification system of suspension bridge in China. Strategic Study of CAE, 2010, 12(4): 95‒99
AI Summary AI Mindmap
PDF(1768 KB)

Accesses

Citations

Detail

Sections
Recommended

/